Providing a full package for the client on this 10 tonne building in Derby. Fully galvanized as per the clients request, further reducing any risk of maintenance on the steel work. Completing the install over the weekend so the busy GAP depot could run unaffected.
Manufactured, delivered and installed ahead of schedule. Working with the client we took on a tight lead time for this 20 tonne building and we still managed to get the building manufactured and installed ahead of schedule.
Using 3D site surveying services we were able to navigate the challenging terrain to be within a 1mm tolerance from drawing. The steel frame is to support a block and beam floor and a oak framed extension to this property.
From the initial idea from the client to working with the architect, structural engineer and the glass supplier to produce the frame work to support a glass canopy to the entrance for a night club in the centre of Leeds.
Utilising our site surveying services and in-house 3D design capabilities to create structural steel work with pin-point accuracy.
Working closely with customers and architects to create products that are both aesthetically pleasing and a bide by all the relevant building regulations to make sign off with building control as stress free as possible.
Creating non-standard industrial units to fit the space an landscape available requires a great attention to detail! We are fully equipt with our process to deliver custom built units in all shapes and sized to the highest quality.
Creating the structural frame work for a building is and incredible responsibility and requires perfection. Working closely with structural engineers and architects to set the project off on the right foot.
Turning ideas in to reality. With our 3D designers being able to create 3D visuals to help customers see there products.
We created a gantry to carry the new carbon capture equipment for the sports centre in Todmorden. Along with access ramps all hot dip galvanised for minimum long term maintenance.